What should be paid attention to in the installation of box-type substations
font size:SmallMiddleBig

The correct installation of the box-type transformer is the key to the correct use of the equipment in the subsequent process. Following the operation instructions can avoid vague failures due to improper installation during use, and reduce the frequency of downtime for maintenance.


1、The box transformer is mainly composed of natural wind and circulating cooling. Therefore, there should be no illegal stacking around it, especially the transformer room door should not be blocked, and the shutters should be regularly removed for ventilation and the attachments on the sub-holes to ensure that all electrical equipment does not exceed the allowable temperature.

2、The floor of the box-type substation should be placed in a higher place, not in a low-lying place, so as to avoid rainwater pouring into the box and affecting the operation of the equipment.

3、Zinc oxide arresters should be installed in the high-voltage distribution room of box-type transformers, and the installation method should be convenient for testing and disassembly and replacement.

4、The box door of the box-type substation should be opened outward, and there should be handles, secret doors and locks, and the secret doors and locks should be rust-proof

5、The noise level of the box-type substation shall not be greater than the specified noise level of the transformer. Regardless of whether the box shell is made of metal or non-metallic materials, the metal frame of the box body should be well grounded, with grounding terminals, and marked with a grounding symbol

6、

The transformer room should be dominated by natural ventilation, and the relationship between the temperature in the box and the output of the transformer should be given. The transformer room can be equipped with room temperature monitoring devices and self-starting ventilation and cooling devices as required to ensure that the transformer is under the specified environmental conditions.

run at full capacity. The transformer should be accessible from the top of the box or from the side doors.

7、The grounding and neutral line of the box-type substation share a grounding grid. The grounding grid is generally grounded at the four corners of the foundation, and then connected into one. The box-type substation and the grounding grid need to have two reliable connections. During the installation process of the box-type substation, attention should be paid to selecting the appropriate location and avoiding damage to the equipment caused by the external environment, which can prolong its service life, improve work efficiency, and bring better benefits to the enterprise.




Updated:2022-07-02 | Back to list
WeChat
WeChat
主站蜘蛛池模板: 亚州中文字幕av| 欧美一区二区三区激情| 欧亚乱熟女一区二区在线| 国产精品亚洲精品日韩已满| 免费无毒永久av网站| 国产乱码字幕精品高清av| 国产真人做爰毛片视频直播| 粗大插入91视频| 亚洲激情综合av| 欧美日韩成人| 91视频入口| 色婷婷美国农夫综合激情亚洲| 无遮无挡三级动态图| 日韩福利在线| 国产精品自拍视频网站| 中文字幕精品久久久久人妻红杏1| 国产喷水福利在线视频| 日逼AV| 国产无线乱码一区二三区| 国产av新搬来的白领女邻居| 亚洲精品2| 成人超碰最大网站| 精品va在线观看| 亚洲色A| 97超碰色偷偷| 国产制服丝袜在线视频观看| 国产卡1卡2 卡三卡在线| 久久这里只有精品18| 欧美人与性动交g欧美精器| 古交市| 精品亚洲成av人在线观看| 日韩av偷拍| 成人超碰最大网站| 国产做爰xxxⅹ高潮视频在线| 人人爽久久久噜噜噜婷婷| 99久久综合狠狠综合久久止| 欧美亚洲国产精品久久蜜芽直播| 亚洲精品国产精华液| 封丘县| 亚洲一区亚洲二区| 亚洲乱码二区|