国产综合一区二区三区av,亚洲一区二区三区在线播放无码,亚洲国产熟女一区二区三区,男女性高爱潮久久,免费人成网上在线观看网址,色窝窝无码一区二区三区色欲,精品无码国产一区二区三区av,无码少妇一区二区三区免费
Price composition of electrical equipment
font size:SmallMiddleBig

Price composition of electrical equipment

1、Primary and secondary components price;

2、The price of auxiliary materials, including: secondary wire, terminal, wire nose, wire clip, bobbin, number tube, character code, cable tie, standard parts, etc.;

3、The price of the busbar, the amount of the busbar is budgeted according to the one-time plan diagram;

4、The shell price should be quoted by the dedicated shell manufacturer according to the one-time plan; box-type substations and non-standard boxes (cabinets) are calculated according to the size of the box.

5、Packaging and shipping costs;

6、Comprehensive expenses of the enterprise, including management fees, labor wages, taxes and profits, etc.;

7、Wanshang Power tells you the quotation process and matters needing attention

1、Digest the drawings:

According to the drawings provided by the user, first check the catalog of drawings, and then assign and classify them. Understand the design intent of the project in accordance with the design instructions and technical requirements of the drawings (if there are bidding documents, the technical requirements of the bidding documents), consider the price required for the calculation of the variable scheme, and pay attention to the floor plan (floor plan The above reflects whether there is a busbar bridge and the length of the busbar bridge between the cabinets).

2、Related Notes:

①、As far as high-voltage cabinets are concerned, in order to meet the five-proof requirements, the incoming cabinet needs to be equipped with a live display (mandatory type: DXN-10, 24/35Q) and an electromagnetic lock, and the outgoing cabinet needs to be equipped with a live display (prompt type: DXN-10/35T ) and grounding switch interlocking device.

②、When the two-way power supply is in, consider the self-switching device, and consider the electrical and mechanical interlocking device (three-in-two) between the two-way power supply and the bus tie.

③、Sulfur hexafluoride ring main unit and KYN28-12 central cabinet generally need to be equipped with temperature and humidity controller and heater.

④、If the interphase and interphase-to-ground distances cannot meet the electrification requirements, busbar vulcanization treatment or special-shaped busbars or heat-shrinkable sleeves for busbar sleeves should be used, and the joints should also be covered with an insulating cover.





Updated:2022-07-02 | Back to list
WeChat
WeChat
主站蜘蛛池模板: 秋霞午夜成人鲁丝片午夜精品| 日韩欧美亚洲综合久久影院| 日本一区中文字幕| 中文字幕+乱码+中文字幕一区| 女女女女女裸体处开bbb| 中文字幕制服丝袜| 丝袜a片| 亚洲人成电影网站在线观看 | 亚洲性激情| 少妇高潮久久久久久毛片| 无码乱码av天堂一区二区| 香蕉大美女天天爱天天做| 日韩一区二区三区av| 美女在线视频一区| 午夜av一区| 国产精品久久久久av| 丰满的少妇愉情hd高清果冻传媒 | 国产精品综合| www.97| 男人扒开女人腿桶到爽免费 | 国产日韩av一区| 久久频这里精品99香蕉| 亚洲一区亚洲二区| 日韩中文一区二区| 欧美18在线观看| 精品夜夜欢| 亚洲久av| 国产V片免费A片视频| 韩国av| 日韩av激情在线| 伊金霍洛旗| 狠狠人妻久久久久久综合| 国产乱淫a∨片| 欧美黑人又粗又大| 国产成人精品亚洲男人的天堂| 昌黎县| www,jizzjizz| 天堂av一区二区三区| 亚洲乱码中文字幕| 拍国产真实乱人偷精品| 天天艹天天干|